Zurück zum Blog

    Installation Guide: Implementing Frolight System in Your Plantation

    December 20, 20258 min read
    Team installing Frolight system in plantation

    Proper installation of the Frolight system is essential to achieve maximum frost protection efficiency. This practical guide covers all aspects of installation, from initial planning to commissioning and preventive maintenance, based on experience accumulated in Moldova plantations.

    Planning and Initial Assessment

    Before installation, a detailed plantation assessment is necessary. This includes terrain topography analysis to identify areas with increased risk of cold air accumulation, evaluation of existing electrical infrastructure, and determination of optimal tube density based on plantation configuration. A Frolight specialist usually performs this assessment free of charge.

    • Topographic analysis to identify risk zones
    • Electrical grid capacity evaluation
    • Optimal density determination: 25-40 tubes/hectare
    • Cable routing and placement planning
    • Budget estimate and implementation timeline

    Step-by-Step Installation Process

    The actual installation takes an average of 2-3 days per hectare and includes mounting supports, installing tubes, laying electrical cables, and configuring the control system. Work is preferably carried out during the vegetative rest period (November-February) to not disturb current agricultural operations.

    • Mount support posts every 8-10 meters
    • Install tubes at cordon height (1.2-1.5m)
    • Lay protected electrical cables
    • Install control panel and sensors
    • Grid connection and initial testing

    Automation System Configuration

    The automation system requires careful calibration for specific plantation conditions. Temperature sensors are placed at representative points, at bud height. Activation thresholds are usually set at +2°C (pre-alert) and 0°C (full activation), with adjustment possibility based on accumulated experience.

    • Place sensors at representative points
    • Set pre-alert threshold: +2°C
    • Set activation threshold: 0°C
    • Configure SMS/email alerts
    • Test and validate operation

    Maintenance and Best Practices

    The Frolight system requires minimal but regular maintenance. Visual inspection of tubes and connections is recommended monthly during the risk season. Periodic cleaning of tubes from deposits and sensor calibration verification ensure optimal long-term operation. Replacement of defective components should be done promptly.

    • Monthly visual inspection during risk season
    • Annual tube cleaning from deposits
    • Annual sensor calibration verification
    • System test before risk season
    • Prompt replacement of defective components

    Fazit

    Professional installation and proper maintenance of the Frolight system guarantees optimal performance over the 15+ year equipment lifespan. Investment in careful preparation and configuration translates directly into protection reliability when it matters most – during critical frost nights that can decide the fate of the entire harvest.

    Interesse an unseren Premium-Trauben?

    Kontaktieren Sie uns für Partnerschaftsmöglichkeiten.

    Kontakt über WhatsApp